The Plain-Language Breakdown

Alright, listen up. You know how some jobs stay in one place like a nice, quiet panel swap in a house? Well, Part IX of Article 110 ain't about those jobs. This is for when your workplace has wheels, tracks, or floats—basically anything that moves or gets dragged around like your apprentice on Monday morning.

(A) Covered - What the Hell Are We Talking About Here?

This part covers portable and mobile power distribution equipment. We're talking:

  • Substations on trailers (yeah, those exist)
  • Construction job trailers
  • Rail cars with electrical systems
  • Mobile shovels (the kind that cost more than your house)
  • Draglines (giant excavators that could pick up your truck)
  • Hoists, drills, dredges
  • Compressors, pumps, conveyors
  • Underground excavators (tunnel boring machines and such)
  • Basically, if it's got an engine, wheels, and needs serious power to do serious work—this is your section

Think mining operations, major construction sites, tunneling projects, and those massive infrastructure jobs where the equipment costs more per hour than you make in a week. If it moves AND uses power, 110.51 is knocking on your door.

(B) Protection Against Physical Damage - Don't Run Cables Like a Rookie

Here's the deal with tunnels specifically: Your conductors and cables need to be:

  1. Above the tunnel floor (not laying in the muck where every piece of equipment, boot, and dropped wrench is gonna run 'em over)
  2. Placed or guarded so they don't get turned into cable pancakes

Look, I've seen what happens when someone runs SO cord on a tunnel floor. Between the water, the equipment traffic, the dropped materials, and general chaos, that cable's gonna have a shorter lifespan than a gas station sushi roll. Mount it up high, protect it with guards, use cable trays—do whatever it takes to keep it out of harm's way.


Key Takeaways (The Stuff You Better Remember)

Part IX of Article 110 specifically covers portable and mobile power distribution equipment—not your everyday fixed installations

Applies to heavy equipment used in construction, mining, tunneling, and industrial operations that moves around

Tunnel cable rules: Conductors MUST be above floor level and protected from physical damage

"Protected from physical damage" means guarded, elevated, in raceways, or otherwise kept safe from getting crushed, run over, or otherwise destroyed

✅ This isn't about running power to your job trailer office—this is heavy industrial, mobile power distribution stuff


Real-World Scenarios (Why This Matters on the Jobsite)

Scenario 1: The Tunnel Job Gone Wrong

You're working on a subway extension project. The GC says "just run the temp power on the floor, we'll be careful." You do it. Three days later, a muck car runs over your feeder cable, shorts out, trips the main, and shuts down a $2 million boring machine for six hours while everyone stands around with their thumbs up their butts.

The right way: Run cables overhead on cable tray or hangers, minimum 7-8 feet up where nothing can touch them. Use armored cable or appropriate raceway. When equipment rolls by, your cables don't even know it happened.

Scenario 2: The Mining Operation

You're wiring up a mobile substation that feeds a dragline excavator at a coal mine. This thing moves every few weeks as the mining operation progresses. Some genius wants to treat it like a permanent installation.

Why 110.51 matters: This is EXACTLY what this section covers. It's mobile equipment requiring special considerations for disconnecting means, grounding, and protection that you won't find in the regular residential/commercial sections. You need to know Part IX applies here, or you'll wire it wrong and potentially kill somebody when it moves.

Scenario 3: The Construction Site Compressor Farm

Big concrete job needs six towable compressors, all diesel-powered with their own electrical panels. Superintendent asks you to wire them up "quick and dirty."

The code reality: These are mobile power utilization equipment units covered by 110.51. They need proper grounding, overcurrent protection, and conductor protection based on Part IX requirements—not whatever "quick and dirty" means in his head. Do it right, or when one fails and takes out the others (or worse, hurts somebody), guess whose license is on the line?


What to Study (Exam Prep Focus)

High-Probability Exam Topics:

  1. Identifying what equipment falls under Part IX coverage

    • Expect questions asking "which of the following is covered by 110.51?"
    • Know the difference between "mobile/portable equipment" vs. regular equipment
  2. Tunnel cable protection requirements

    • "Cables in tunnels shall be located _____ the tunnel floor" (ABOVE)
    • Multiple choice about proper protection methods
  3. General application questions

    • "Part IX of Article 110 applies to..." type questions
    • Scenario-based: "An electrician is installing cables in a tunnel. According to 110.51(B)..."

Study Tips:

  • Memorize the equipment list in (A)—at least know the general categories (mining equipment, construction equipment, mobile substations)
  • Remember "above and protected" for tunnel cables—that's free points on any exam
  • Understand this is PART IX—many test questions will reference "Article 110, Part IX" to see if you know it's the mobile/portable equipment section
  • Look at the rest of Part IX (110.52-110.59) to understand the full picture—grounding, disconnecting means, etc.

Code Book Navigation:

  • Article 110 is divided into PARTS—make sure you can flip to Part IX quickly
  • Part IX starts at 110.51 and runs through 110.59
  • Tab this section if you're taking an open-book exam—it's easy to forget it's buried in Article 110

The Bottom Line (Your Foreman's Final Word)

Look, most of us spend our careers doing resi, commercial, or light industrial work where nothing moves. But if you end up on heavy construction, mining, or major infrastructure projects, you NEED to know Part IX exists.

The second someone says "tunnel," "mobile substation," or points at a piece of equipment worth seven figures that moves around, alarm bells should go off: "Wait, is this Part IX stuff?"

And for God's sake, keep cables off tunnel floors. I don't care if it's "just temporary" or "we'll be careful"—that's famous last words territory. Mount 'em high, protect 'em right, and sleep easy knowing you won't be the electrician who shut down a multi-million dollar operation because a loader ran over your cable.

Remember: If it's got wheels, tracks, or floats—and it uses power—Part IX probably wants a word with you. 🚜⚡


Now get back to work, and if you're running cable in a tunnel, get a damn ladder.

NEC Reference: Section 110.51 · 2026 NEC (NFPA 70)