Alright, listen up. You know how your mother-in-law says, "Everyone needs to stay connected"? Well, the NEC agrees—at least when it comes to metal stuff in tunnels. Article 110.54 is all about making sure every piece of metal in a tunnel installation is holding hands with the ground like they're at a damn kumbaya circle.

Here's the deal in plain English: Every single non-current-carrying metal part of your electrical gear—panels, boxes, raceways, cable armor, you name it—needs to be solidly grounded AND bonded to all the metal pipes and rails in that tunnel. And you can't just do it once at the entrance and call it a day while you head to lunch. You gotta keep bonding at the portal (fancy word for "entrance") and then every 1,000 feet throughout the entire tunnel.

Think of it like this: You're creating a continuous metal highway where fault current can zip back to the source faster than your apprentice can say, "I forgot my wire strippers in the truck." In a tunnel—where it's dark, damp, and you're surrounded by conductive surfaces—you absolutely DO NOT want stray voltage hanging around looking for a path to ground. Spoiler alert: You could be that path.

Why This Rule Exists (Besides Ruining Your Day)

Tunnels are basically worst-case scenarios wrapped in concrete. You've got:

  • Moisture (because of course there is)
  • Metal everything (pipes, rails, raceways, structural steel)
  • Limited escape routes (can't exactly dive out a window)
  • Workers in constant contact with grounded surfaces

If a fault happens and your bonding sucks, the entire tunnel becomes a 277-volt haunted house. The Code wants all that metal bonded together so if something goes sideways, the fault current has a superhighway back to the source, trips the OCPD instantly, and nobody becomes a crispy critter.

The 1,000-foot interval rule? That's to ensure you maintain low-impedance all the way through. Because a ground fault doesn't care that your tunnel is a mile long—physics still applies, and resistance over distance is real.


Key Takeaways (The Stuff That Actually Matters)

Technical Requirements:

  1. Bond ALL non-current-carrying metal parts of electrical equipment (enclosures, boxes, panels, disconnects, etc.)

  2. Bond ALL metal raceways and cable sheaths/armor (EMT, RMC, IMC, MC cable armor, etc.)

  3. Bond to ALL metal pipes and rails present in the tunnel

  4. "Solidly" grounded and bonded means a permanent, low-impedance connection—no half-assed sheet metal screws, no relying on "the conduit threads will do it"

  5. Bonding intervals: Portal + every 1,000 feet maximum throughout the tunnel length

  6. This applies to the ENTIRE tunnel installation—from start to finish, no exceptions

  7. The equipment grounding conductor must be sized per 250.122 (based on the rating of the OCPD)


Real-World Jobsite Scenarios (Learn From Other People's Mistakes)

Scenario 1: "The Subway Shocker"

The Setup: Crew installing lighting in a subway tunnel. They grounded everything at the entrance portal but figured, "Eh, the conduit's continuous, we're good." They skipped the 1,000-foot bonding intervals.

What Happened: A train maintenance vehicle damaged a cable 1,500 feet in. The fault current tried to get home through the conduit system, but with high impedance over that distance, the breaker took its sweet time tripping. Meanwhile, a worker touched a junction box and the energized metal railing simultaneously.

The Lesson: He survived, but he'll never forget to bond every 1,000 feet. Neither will his lawyer. The 1,000-foot rule isn't a suggestion—it's physics and safety having a baby.

Scenario 2: "The Mine That Wasn't Fine"

The Setup: Mining tunnel installation. Electrician bonded all the electrical equipment together nicely but didn't bond to the metal water pipes and overhead I-beam rails "because they're not electrical."

What Happened: Lightning strike on surface equipment sent current down into the tunnel. With no bonding to the other metal systems, different metal parts rose to different potentials. Worker standing on wet ground touched a pipe and a light fixture at the same time—created his own circuit.

The Lesson: The Code says "ALL metal pipes and rails" for a reason. In a tunnel, everything metal is part of the grounding system whether you like it or not. Bond it all together so everything rises and falls at the same potential. No voltage difference = no shocking surprises.

Scenario 3: "The Inspection That Stopped Everything"

The Setup: Big utility tunnel project. Electrical contractor read "bonded to all metal pipes and rails" but interpreted it as "bond when you encounter them." Did a beautiful job on the electrical gear but only bonded to pipes/rails where they happened to cross paths.

What Happened: Inspector failed the entire installation. Project stopped for two weeks while they went back and installed proper bonding jumpers to systematically bond all metal systems together at proper intervals.

The Cost: $47,000 in labor and schedule delays, plus they had to heat the tunnel in January to make connections because winter happened while they argued.

The Lesson: "Solidly grounded and bonded to ALL metal pipes and rails" means creating a deliberate bonding system, not just hoping your raceway accidentally touches a pipe somewhere. Do it right the first time.


What to Study (For When You're Ready to Prove You Know Your Stuff)

If you're prepping for your Journeyman or Master's exam, here's what they love to ask about 110.54:

High-Probability Exam Topics:

  1. The 1,000-foot maximum interval

    • They'll give you a tunnel length and ask how many bonding points you need
    • Math: Divide tunnel length by 1,000, round up, add one for the portal
    • Example: 2,800-foot tunnel = portal + 1,000 ft + 2,000 ft + at the end = 4 bonding locations minimum
  2. What gets bonded (memorize this list):

    • Metal enclosures and boxes
    • Metal raceways (all types)
    • Cable sheaths and armor
    • Metal pipes (water, gas, compressed air, etc.)
    • Metal rails and structural members
  3. "Solidly grounded" definition

    • Permanent connection
    • Low impedance path
    • Capable of carrying fault current safely
    • Properly sized per 250.122
  4. Why bonding intervals matter

    • Reduces impedance over distance
    • Ensures effective fault current path
    • Maintains equipotential plane
    • Faster OCPD operation
  5. Related Code sections you need to know:

    • 250.4(A)(5) - Effective ground-fault current path requirements
    • 250.122 - Size of equipment grounding conductors
    • 250.120 - Equipment grounding conductor installation
    • 590.6(C) - Grounding of temporary wiring in tunnels
  6. Common exam trick questions:

    • "Can you use the metal raceway as the only equipment grounding conductor?" (Yes, IF it's a qualifying raceway per 250.118, but you still must bond to other metal systems)
    • "If your tunnel is 950 feet, do you need bonding points beyond the portal?" (Yes! Just because it's under 1,000 feet doesn't mean you skip bonding at the far end)
    • "Do PVC pipes need to be bonded?" (No, but any metal pipes do, and if there's metal in the PVC like tracer wire, that's a gray area—best practice says bond it)

Study Tips from the Old Guy:

  • Draw it out. Sketch a tunnel cross-section showing all metal systems bonded together. Visual memory sticks better than reading the Code book for the 47th time at 11 PM.

  • Remember the "why." Tunnels are confined spaces with limited egress, high humidity, and workers constantly touching grounded metal. This rule prevents the tunnel from becoming a series circuit with your body as the resistor.

  • Know the difference: Bonding vs. Grounding

    • Grounding = connecting to earth
    • Bonding = connecting metal parts together so they're at the same potential
    • In tunnels, you need BOTH, and they work together
  • Memorize: Portal + 1,000-foot intervals. If you remember nothing else, remember this. It shows up on exams ALL THE TIME.


The Bottom Line

Article 110.54 is the Code's way of saying, "Look, tunnels are dangerous enough without adding electrocution to the mix." Bond everything metal together, do it at the entrance, and keep doing it every 1,000 feet. It's not complicated, but it IS critical.

And here's the thing: This rule has been written in the blood of workers who found out the hard way what happens when you don't bond properly underground. So yeah, it's a pain in the ass to run bonding jumpers every thousand feet in a cramped, muddy tunnel. But it's a lot less of a pain than explaining to someone's family why you cut corners.

Stay safe, bond everything, and remember: In a tunnel, all metal is guilty until proven grounded and bonded.

Now get out there and make those connections—the solid, low-impedance kind, not the "it'll probably be fine" kind.

Class dismissed. And for God's sake, somebody grab the apprentice before he tries to use tie wire as a bonding jumper.

NEC Reference: Section 110.54 · 2026 NEC (NFPA 70)

Want All 2,966 Sections?
Unlock every NEC section, 47,000+ practice questions, exam simulations, spaced-repetition flashcards, and full progress tracking. Starting at $8.33/mo.