110.55Transformers, Switches, and Electrical Equipment

Article 110GENERAL REQUIREMENTS FOR ELECTRICAL INSTALLATIONS

110.55: Keep Your Underground Gear from Getting Murdered

The "Don't Let a Backhoe Eat Your Transformer" Rule

Alright, gather 'round. Let's talk about that gear you're burying underground like you're hiding evidence. Transformers, switches, motor controllers, motors, rectifiers—basically anything electrical that's living like a mole down there—it all needs to be protected from getting absolutely wrecked.

Think about it: underground is where bad things happen. Excavators driven by guys who think "Call Before You Dig" is just a polite suggestion. Tree roots that don't care about your EMT. Groundwater that wants to make friends with your 480V gear. The Code says simple: location or guarding. That means either put it where nothing can touch it, or guard it like you're protecting the last donut in the break room.

What This Actually Means in Human

You've got two plays here:

Option 1 - Location (The "Hide It Real Good" Method): Put your equipment somewhere that backhoes, delivery trucks, and drunk landscapers can't reach it. Concrete pad behind the building where vehicles don't go? Perfect. Six feet deep in a properly rated vault? Chef's kiss.

Option 2 - Guarding (The "Build a Fortress" Method): Bollards. Concrete barriers. Steel plates. Basically, turn your underground vault access into Fort Knox. If something can ram into it, run over it, or accidentally destroy it, you need protection that says "Not today, Satan."

The Code doesn't care which method you pick—just pick one. Because explaining to your boss why the site's been dark for six hours because someone drove over the transformer pad? That's a conversation you don't want to have.


Key Takeaways (The Stuff That Actually Matters)

🔧 What needs protection: ALL underground electrical equipment

  • Transformers
  • Switches
  • Motor controllers
  • Motors
  • Rectifiers
  • Other equipment (yeah, they threw in the catch-all because electricians are creative)

🔧 Two acceptable methods:

  • By location: Install where physical damage isn't likely (proper depth, away from traffic/equipment)
  • By guarding: Install physical barriers (bollards, concrete encasements, steel plates, vaults)

🔧 "Physical damage" means:

  • Vehicle impact
  • Excavation equipment
  • Heavy loads above
  • Basically anything that goes "crunch"

🔧 This is a "shall" requirement - not optional, not a suggestion, SHALL means "do it or you failed inspection"


Real-World Jobsite Scenarios (Tales from the Trenches)

Scenario 1: The $45,000 Oopsie

Commercial parking lot, pad-mount transformer

The Setup: You spec'd a beautiful pad-mount transformer right at the edge of a parking lot. Saved the owner 200 feet of trench. You're a hero! Except you mounted it flush with the parking bumpers because "it looks cleaner."

What Happened: Three months later, a delivery truck backs up "just a little too far." The transformer housing looks like it went three rounds with Mike Tyson. Now you're dealing with the utility company, who is NOT happy, and a $45K replacement bill.

The Fix: Should've installed concrete-filled steel bollards 3 feet in front of the transformer. Yeah, they're ugly. Yeah, they cost $800. But $800 < $45,000. Math checks out.


Scenario 2: The Invisible Motor Controller

Underground pump station, residential development

The Setup: You installed a submersible pump motor controller in an underground vault. Access cover is flush-mounted in grass. No guards, no visible markers, just a cover plate. "The homeowners will know it's there," you figure.

What Happened: New homeowner decides to install a decorative boulder "right there in that flat spot." Uses a mini excavator. The boulder now sits on top of your motor controller enclosure, which is now shaped like a taco shell. The HOA is involved. Everyone's attorney has an attorney.

The Fix: Concrete pad extending above grade with bollards, or a vault designed for vehicle loads with clear marking. Better yet, location—put it in the utility easement where landscaping doesn't happen.


Scenario 3: The Rectifier That Wanted to Be a Pool

Industrial facility, outdoor equipment yard

The Setup: Buried rectifier cabinet for a DC system. Installed in a low spot (because that's where the trench naturally went). Light-duty cover because "it's in a fenced area, no vehicles."

What Happened: Heavy rain. The vault fills with water. Your rectifier is now doing its best impression of a fish tank. Bonus: the facility uses that low spot to park their forklift when it rains because it's "already muddy anyway." The cover is now powder.

The Fix: Location, location, location. Should've been on high ground with proper drainage. And if vehicles can possibly access it—even "they're not supposed to"—it needs vehicular-rated guarding.


What to Study (Exam Prep Gold)

When test-time comes around, here's what they love to ask about 110.55:

High-Probability Exam Questions:

  1. The Two Methods Question

    • "Underground equipment must be protected by _____ or _____"
    • Answer: Location or guarding
    • They love this fill-in-the-blank style
  2. Equipment List Questions

    • "Which of the following must be protected when installed underground per 110.55?"
    • They'll list transformers, switches, motors, etc., and throw in some curveball like "conduit" (which isn't equipment)
    • Know what counts as "equipment"
  3. Scenario-Based Questions

    • They'll describe a pad-mount transformer location and ask if it complies
    • Look for: proximity to vehicle traffic, presence of barriers, adequate depth/protection
    • If there's vehicle access and no guards = wrong answer
  4. The "Shall" Question

    • "Protection of underground equipment is: (required/recommended/optional)"
    • It's REQUIRED—"shall" means mandatory

Memory Tricks:

"Underground Gear Needs a Bodyguard or a Hiding Spot"

  • Bodyguard = guarding
  • Hiding spot = location

The equipment list: Think "TSMRR" (Transformers, Switches, Motors, Rectifiers, + other stuff)

  • Or just remember: "If it's electrical and underground, it needs protection. Period."

What They Won't Ask (But You Should Still Know):

  • Specific bollard dimensions (not in this section)
  • Exact burial depths (that's elsewhere in the Code)
  • Specific load ratings for covers (reference other standards)
  • BUT understand the principle: protection adequate for the environment

The Bottom Line (So Simple Your Helper Can Understand It)

If you're putting electrical equipment underground, pretend it's your own truck parked there. Would you protect YOUR truck from getting hit, flooded, or crushed? Of course you would—you just made the last payment!

Same logic here. Location (put it where trouble ain't) or guarding (build a fence between it and trouble). Pick one. Do it right. Sleep well knowing you won't get a 2 AM call because someone turned your transformer into modern art.

And remember: the inspector WILL ask about protection on underground gear. Every. Single. Time. Because they've seen what happens when you skip it, and they're tired of the paperwork.

110.55 in six words: Protect underground equipment or pay later.

Now get out there and guard some gear! 🔧⚡


Pro tip: Take pictures of your guarding/protection during installation. When something goes wrong years later and everyone's pointing fingers, that photo of properly installed bollards before the owner "modified" them might just save your bacon.

NEC Reference: Section 110.55 · 2026 NEC (NFPA 70)